Documentation

 
Documentation

Legal notice
Documents in this section of the CDPQ Infra website are provided solely for historic information and reference purposes and may no longer be accurate or valid after their publication. Information contained in CDPQ Infra archived documents reflect the situation as of the date of publication. Archived documents will not be updated or otherwise revised to reflect subsequently available data, current circumstances or changes that occurred after their publication date.

Environment

Environmental Impact Study – Main Report – A10 & Downtown Montreal Transit Project (French only)

Download
Environment

Economic Impact Study – Operating and maintenance expenses related to a railway-type public transport project – April 2016 (French only)

Download
Environment

Forecasting Projections – Public transit systems in the West Island of Montreal, via the airport – March 2016

Download
Technical sheet

Project fact sheet “Electric public transit system to Montréal’s West Island”

Download
Legal

Highlights of the agreement

Download
Technical sheet

Project fact sheet “Electric public transit system on the new Champlain Bridge”

Download
Legal

Full text of the public infrastructure agreement

Download

Summary REM Forecasting Report –November 2016

Request for Qualification and addendum - Engineering, Procurement and Construction for the Infrastructures

REM map - connections with actual networks

Appendix 1 – Request for Qualification: Results

REM - Fact sheets (route optimizations) on the Environmental Impact Study

Sketch of a station (vision)

Images of new stations in downtown Montréal

Appendix 2 - Attestation of Assurance Process Auditor – Request for qualification Contracts IAC & MRSEM